EasyManua.ls Logo

DeFelsko PosiTest AT-A User Manual

DeFelsko PosiTest AT-A
77 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Automatic Pull-Off Adhesion Tester
Instruction Manual

Other manuals for DeFelsko PosiTest AT-A

Question and Answer IconNeed help?

Do you have a question about the DeFelsko PosiTest AT-A and is the answer not in the manual?

DeFelsko PosiTest AT-A Specifications

General IconGeneral
ModelPosiTest AT-A
TypeAdhesion Tester
Accuracy±1% of full scale
Resolution0.01 MPa (1 psi)
Measurement UnitsMPa, psi
Data LoggingYes
DisplayLCD
Measurement Range0-10, 000 psi (0-70 MPa)
Dollies20 mm
Memory1000
PowerRechargeable battery

Summary

Introduction

Basic Steps to Perform a Pull-Off Test

Outlines the fundamental stages required to conduct a pull-off adhesion test accurately.

Instrument Overview

Components and Controls

Details the instrument's components, display, and multifunction keypad for operation.

Multifunction Keypad Operation

Explains the function of directional buttons, select, power, and stop buttons for instrument control.

Dolly & Coating Preparation

Dolly Preparation

Instructions for cleaning and abrading the dolly base to remove contaminants and ensure proper adhesion.

Coating Preparation

Guidance on lightly roughening the coating surface for optimal glue bonding, with a note on potential flaws.

Glue & Dolly Application

Glue Selection and Application

Discusses glue selection, its properties, and the process of applying it to the dolly.

Dolly Attachment and Curing

Details attaching the glued dolly to the surface, removing excess, and allowing the adhesive to cure.

Test Area Isolation

Cutting and Drilling for Isolation

Details cutting around the dolly or using a drilling template to isolate the test area.

Pull-Off Test Procedure

Instrument Preparation and Test Execution

Steps for preparing the instrument and performing the pull-off test, including parameter checks.

Performing the Pull-Off Test

Initiating and Monitoring the Test

Instructions for initiating the test, building pressure, and monitoring the pull-off process.

Result Recording and Analysis

Details on how test results, including pass/fail and fracture nature, are automatically stored in memory.

Navigating Memory Views

Carousel Navigation and Core Views

Describes carousel navigation and the Main, Reading List, and Summary views for data review.

Detailed Data and Annotation Views

Covers Layer/Fracture, Reading Note, and Batch Note views for detailed analysis and annotation.

Fracture Analysis Guide

Visual Identification of Failures

Illustrates and defines cohesive, adhesive, and glue failures for accurate recording.

Test Result Analysis

Cohesive, Adhesive, and Glue Failure Types

Defines and illustrates cohesive, adhesive, and glue failures occurring within or between coating layers.

Memory Operations

Batch Creation and Opening

Details procedures for creating new memory batches and opening existing ones for data management.

Batch Management Functions

Close and Delete Batch Operations

Describes how to close the current batch and remove batches and associated measurements from memory.

Setup Menu Configuration

Pull Parameters and Orientation Settings

Details configuration for Dolly Size, Pull Rate, Limit, Hold Time, and display orientation.

Units Conversion

Gage Information Display

Instrument Reset Procedure

Clock Setting and Management

Accessing Measurement Data

PosiSoft Data Management Solutions

Details PosiSoft USB Drive, Desktop, PosiSoft.net, and PosiTector App for viewing, storing, and reporting data.

Connectivity Menu

WiFi Connection Setup

Allows connection to wireless networks for synchronizing stored measurements with PosiSoft.net.

USB Data Transfer

Keyboard Data Input

Stream Data Transmission

Sync .net Now and Bluetooth

Sync Batches for PosiTector App

Send Batches to PosiTector App

Software Updates and Reset Warning

Power Supply and Charging

Battery Operation and Charging

Details the built-in rechargeable NiMH battery, charging process, and recommendations for maintaining battery performance.

Calibration and Verification

Calibration and Verification Procedures

Explains calibration by manufacturer/labs and the use of the PosiTest AT Verifier for accuracy checks.

Technical Data

Specifications and Dolly Sizes

Lists resolution, accuracy, and maximum pull-off pressure for different dolly sizes.

Returning for Service

Limited Warranty Information