EasyManua.ls Logo

Dell EMC Edge Gateway 5200 - Page 41

Dell EMC Edge Gateway 5200
59 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 69. Install screws and nuts on side panel
Figure 70. Install screws and nuts on bottom panel
NOTE: Reuse screws removed from step 1. Nuts are included in the kit.
7. Remove the screws of the front I/O panel, as shown in the following figure. Remove the 4-port COM cable from the front
I/O panel.
Installation procedure for 2x GbE LAN uFM module
41

Other manuals for Dell EMC Edge Gateway 5200

Related product manuals