1-14 2-Post Rack Installation
www.dell.com | support.dell.com
6 Route the system status indicator end of the cable through the cable-management
arm, and install the indicator in its slot at the back end of the cable-management arm
(see Figure 1-8).
Figure 1-8. Installing the System Status Indicator Cable
7
Connect the power cords to their receptacles on the back panel (see Figure 1-9).
system status
indicator cable plug
wire covers in
open position
system status indicator