EasyManua.ls Logo

Delta UV D-31 User Manual

Delta UV D-31
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
© 2015 Delta Ultraviolet Corporation All Rights Reserved Rev 01/16 P/N 94-35234 Page 1
D/DS Series
Ultraviolet Sanitizer/Clarifier System
INSTALLATION AND MAINTENANCE MANUAL
DELTA ULTRAVIOLET CORPORATION
CORPORATE HEADQUARTERS
1535 West Rosecrans Ave
Gardena, CA 90249
Phone 310-323-6400
Toll free 866-UV9-8765
Fax 310-323-6403
www.deltauv.com
.#3150259 EPA Est. #075659-CA-001
Question and Answer IconNeed help?

Do you have a question about the Delta UV D-31 and is the answer not in the manual?

Delta UV D-31 Specifications

General IconGeneral
Inlet/Outlet Size3/4" MNPT
UV Lamp Power30W
ApplicationResidential, Commercial
Maximum Flow Rate12 GPM (Gallons Per Minute)
Flow Rate12 GPM
Voltage120V
Operating Pressure125 psi
Operating Temperature36-104°F (2-40°C)

Summary

Technical Characteristics

Important Safety Instructions

Instructions for Risk of Fire, Electric Shock, or Injury

Introduction to Delta UV Unit

Pre-Installation Considerations

Sanitizer Installation

Installation Process Overview

Details the initial steps and overall process for installing the UV unit.

Locating the UV Unit

Guidance on selecting the optimal physical location for the UV unit installation.

Plumbing the UV Unit

Instructions for connecting the UV unit into the pond or pool circulation system.

Use and Maintenance Safety

Inlet and Outlet Unions

Installation Procedures

Mounting the UV Unit

Securing the DELTA UV unit to a solid base using mounting holes.

Gluing Piping to the UV Unit

Connecting PVC piping to the UV unit's union tail pieces using primer and cement.

Electrical Chamber

Electrical Connection Details

Details the power requirements and connection process for the DELTA UV unit.

Start-Up Procedure

Steps to verify the unit and initiate operation after installation.

Start-Up Steps

UV Lamp Replacement and Quartz Tube Maintenance

Maintenance Steps Overview

Detailed steps for disconnecting power, removing components, and cleaning the quartz tube.

Reassembly and Verification

Instructions for reassembling the unit, plugging it in, and verifying bulb operation.

Winterizing the UV Unit

Parts and Diagrams

Frequently Asked Questions (FAQ)

Troubleshooting Common Issues

Two Year Limited Warranty

Related product manuals