-14-
1. Installation guide
This guide is intended for trained specialised personnel. For this reason no
basic working steps are included.
The seal on the meter (see g. IV, pos. 18) must not be dam-
aged!
A damaged seal will result in immediate invalidation of the fac-
tory warranty and calibration/conformity.
The meter must be installed in compliance with the requirements
of EN 14151 and the EC Type Examination Certicate!
The standards for drinking water installations (e.g. DIN 1988)
must be observed!
Medium: Water without additives
The IZAR@MOBILE 2 software is used for readout/parametrization and is
available online at www.diehl.com/metering.
Table of content
1. Installation guide .............................................................14
2. Transport and storage ......................................................15
3. Installation / Initial operation .........................................15
4. Battery power supply (one or two batteries) ...................17
5. Pin assignment of cable ...................................................17
6. Pulse outputs (open collector) .........................................17
7. Due date function .............................................................19
8. Interfaces .........................................................................19
9. Operation .........................................................................19
10. Displays ............................................................................22
11. Disposal ............................................................................23
12. Declaration of conformity for MID meters .......................23
HYDRUS
Deutsch
English
Français Português