OPERATOR’S MANUAL with Maintenance Information
Operating Instructions
31
Don’t engage the safety arm
unless unload the platform.
Using this safety arm is
necessary during operations near the scissor
system if the platform is lifted!
How to Fold Down the
Guardrails
The platform railing system consists of three
fold down rail section for the extension deck
and three sections for the main deck. All
sections are held in place by four latches.
Closed latch
Open latch
1 Fully lower the platform and retract the
platform extension.
2 Remove the platform controls.
3 Opening the latches in the corners the rails
have to be folded in correct order of the
numbering.
2
4
6
1
3
5
1
2