EasyManua.ls Logo

DINGLI JCPT2223RTA - Page 67

DINGLI JCPT2223RTA
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATOR’S MANUAL with Maintenance Information
Maintenance
60
E-5
Perform Engine Maintenance
Engine specifications require that this
procedure be performed every 6000 hours.
Required maintenance procedures and
additional engine information is available in the
engine operator’s manual.
E-6
Perform Engine Maintenance
Engine specifications require that this
procedure be performed every 12,000 hours.
Required maintenance procedures and
additional engine information is available in the
engine operator’s manual.

Related product manuals