EasyManua.ls Logo

Doosan PUMA 480XLM - User Manual

Doosan PUMA 480XLM
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Machine Tools
Installation Manual
(PUMA 480LM)
Question and Answer IconNeed help?

Do you have a question about the Doosan PUMA 480XLM and is the answer not in the manual?

Summary

Preparations before shipment

1.2 Foundation Work

Recommendations for preparing the foundation, including timing, checkpoints, and structural requirements.

Second Round of Mortar Injection (Grouting)

4.1 Checkpoints before injecting mortar

Pre-injection checks for foundation holes to ensure proper mortar application and machine accuracy.

4.3 Injecting the mortar mixture

Procedures for pouring and compacting mortar into foundation holes for optimal fill and adhesion.

Connecting the main power and air sources

5.1 Connecting the main power source

Details on power requirements, cable specifications, and connection procedures for the main power supply.

Removing the transit clamps

Machine Leveling

8.1 Leveling instructions

Detailed steps and guidelines for accurately leveling the machine using leveling bolts and a level gauge.

Precision Measurement & Correction

9.1 Runout on the spindle & nose

Procedure to check spindle and nose runout, and methods for correction if necessary.

9.2 Parallelism between center line of spindle and Z-axis movement

Methodology for measuring spindle-Z axis parallelism and adjusting the head stock for accuracy.

Q-Setter Operation

Summary

Preparations before shipment

1.2 Foundation Work

Recommendations for preparing the foundation, including timing, checkpoints, and structural requirements.

Second Round of Mortar Injection (Grouting)

4.1 Checkpoints before injecting mortar

Pre-injection checks for foundation holes to ensure proper mortar application and machine accuracy.

4.3 Injecting the mortar mixture

Procedures for pouring and compacting mortar into foundation holes for optimal fill and adhesion.

Connecting the main power and air sources

5.1 Connecting the main power source

Details on power requirements, cable specifications, and connection procedures for the main power supply.

Removing the transit clamps

Machine Leveling

8.1 Leveling instructions

Detailed steps and guidelines for accurately leveling the machine using leveling bolts and a level gauge.

Precision Measurement & Correction

9.1 Runout on the spindle & nose

Procedure to check spindle and nose runout, and methods for correction if necessary.

9.2 Parallelism between center line of spindle and Z-axis movement

Methodology for measuring spindle-Z axis parallelism and adjusting the head stock for accuracy.

Q-Setter Operation

Doosan PUMA 480XLM Specifications

General IconGeneral
BrandDoosan
ModelPUMA 480XLM
CategorySander
LanguageEnglish

Related product manuals