EasyManua.ls Logo

Dorel DL7519E - Page 11

Dorel DL7519E
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP 4
TWIN BUNK BED
DL7519E / DL7519W
Insert wood dowels (7) into each end of the long guardrails (M).
Attach two long guardrails (M) and two top side rails (H and J) to top posts (A and B) & (A and
C) as shown.
Fasten top side rails (H and J) with joint connectors (1) and barrel nuts (8). Fasten long
guardrails (M) with wood joint connectors (3). Use Hex key (9) to tighten all joint connectors.
This is the upper bunk.
3
M
3
M
3
M

Related product manuals