EasyManua.ls Logo

Dorel DL7519E - Page 13

Dorel DL7519E
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP 6
NOTE: If you notice that any slats (L) are not perfectly flat, be sure to assemble them so that slat (L)
curves up in the middle and down at the ends.
Insert slats (L) into the remaining holes on the bottom side rails (I and K) on the lower bunk.
Secure slats (L) to the bottom side rails (I and K) with flat head wood screws (4), using a phillips head
screw driver (not included).
Repeat step 5 and 6 to attach slats (T and L) to the upper bunk.
TWIN BUNK BED
DL7519E / DL7519W
NOTE: Slats (T and L) will be placed between two wooden blocks.

Related product manuals