Before powering-up the case, be certain that all of the steps listed below
have been completed to ensure proper case functionality, safety and com-
pliance with warranty terms.
Have you thoroughly examined the case for shipping damage? (see
pg. 2)
Have you removed and discarded the casters? (see pg. 3)
Have you checked the vertical plumb of the case? The horizontal
level? (see pg. 3)
Have you applied the foam tape gasket and sealant between adjoining
cases? (see pg. 3)
Have you sealed the case-to-case joints by applying caulk and acrylic
tape to the pipe-chase seam? (see pg. 4)
Have you removed the shipping blocks from the refrigeration lines?
(see pg. 6)
Have you sealed any tank penetrations? (see pg. 6)
Have you cleared the case of any loose packaging or case materials?
(see pg. 7)