FLOOR PREP
1. Ask the general contractor if your current copy of the build-
ing dimensions are the most recently issued. Also, ask for
the points of reference from which you should take dimen-
sions to locate the cases.
2. Using chalk lines or a laser transit, mark the fl oor where
the cases are to be located for the entire lineup. The lines
should coincide with the outside edges of the case feet.
3. Move case as close as possible to its permanent location.
Remove all crating and shipping braces above the ship-
ping pallet. Loosen the plastic dust cover from the pallet,
but leave cover over the case to protect it while removing
the case from the pallet.
4. Shipping braces with a sled runner construction can either
have metal brackets that can be removed with a screw
gun, or wood blocks that can be removed with a J-bar.
Note: Shipping braces are normally located at each
corner of the case. (Shipping braces used vary and are
based on case design for best transport.)
5. Carefully, if horizontal supports, lift case up and off the
pallet. Remove dust cover. Installation hardware ships in
a marked packet located inside the case. Remove dust
cover. Installation hardware ships in a marked packet
located inside the case.
6. Leveling is necessary to ensure proper operation of the
refrigeration system and drainage of the condensate.
Locate the highest point on the positioning lines as a ref-
erence for determining the proper height of the shim-pack
levelers. A laser transit is recommended for precision and
requires just one person. Level adjustable feet by twisting,
if applicable, or shim as necessary under horizontal sup-
LOCATION
This refrigerated display case has been designed for displaying
and storing perishable food product. It is engineered for air-
conditioned stores with a maximum ambient of 75°F and 55%
relative humidity.
When selecting the location for placement of this case, avoid
the following conditions:
Excessive Air Movement
1. Doors
2. Air-conditioned vents
3. Other air sources
Excessive Heat
1. Windows
2. Sun
3. Flood lamps 8 feet or less from the product
4. Other heat sources
Fig. 1 Horizontal supports
SUPPORTS
C A U T I O N
Locate the horizontal supports under unit before
removing from pallet. Failure to do so will dam-
age the fi nished metal if correct lift points are
not identifi ed prior to removal.
LINE-UP & INSTALLATION
Single Case
1.
Move the case into position. Using a “J” bar, raise the end
C A U T I O N
These cases are not designed for excessive
external weight. Do not walk on top or inside
of cases. Doing so may result in case damage
and/or personal injury.
CASE INSTALLATION
ports as this will help ensure that the case is not settling
over time.
7. Locate horizontal support positions along the chalk line
(Fig. 1). Spot properly leveled shim packs at each support
location.
8. If necessary, drill a hole in each end of every horizontal
support (Fig. 2) and fasten to the fl oor with concrete
anchors. Note: The holes do not need to be in the exact
locations specifi ed here. Be sure that the anchors are
close to the end of the horizontal supports and at each
corner of the case.
Fig. 2 Seismic anchoring locations