EasyManua.ls Logo

Draper SL User Manual

Draper SL
8 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
CAUTION
Read and understand
all warnings
(Page 2
of this document)
before
beginning installation.
Contents
Overview - Components .......................................................................................1
Overview - Planning ..............................................................................................1
PLEASE READ - Safety Information ....................................................................2
Section 1 - Hanging Unit ......................................................................................3
Section 2 - Operation............................................................................................3
Section 3 - Adjusting for Level or Center of Gravity ........................................ 4
Section 4 - Installing Projector ...........................................................................4
Section 5 - Attaching Universal Projector Mount to Projector Pan ..............4
Section 6 - Installing Optional Environmental Air Space Housing ...............5
Installing Optional Ceiling Trim Kit .............................................................................5
Section 7 - Installing Ceiling Closure .................................................................5
Section 8 - Connecting Controls to Data Cable Splitter Board .................... 6
Section 9 - Clearing and Resetting Show Position ..........................................6
Section 10 - Optional Delay Feature ...................................................................6
Section 11 - Electrical Connections ...................................................................7
Section 12 - Operation ..........................................................................................7
Section 13 - Testing Safety Limit Switches ....................................................... 7
Section 14 - Adjusting Limit Switches ...............................................................7
Section 15 - Wiring Schematic ............................................................................8
Section 16 - Dimensions ......................................................................................8
Overview - Components
Overview - Planning
1.
Based on screen location and projector
specifications, determine proper position for
projector installation.
2.
Confirm that there is adequate space for
installation and operation. Minimum clearance
above ceiling level varies according to height
of projector, optional projector mounting
bracket, optional ceiling closure and optional
Environmental Housing.
3.
Arrange to provide service access to the unit.
4.
When installed with Environmental Air Space Housing
unit is suitable for use in an environmental air space
in accordance with Section 300.22
(C)
of the National
Electrical Code, and Section 2-128, 12-010
(3)
and 12-100
of the Canadian Electrical Code, Part 1, CSA C22.1.
5.
Total capacity of lift including cables, closure, projector,
and bracket:
As Soon As Lift Arrives
1.
Open carton and inspect for damage.
2.
Locate the following parts:
A.
The unit itself
B.
Controls
C.
Any optional equipment
SL4
132 LBS. 60KG
SL6
125 LBS. 56.7KG
SL8
118 LBS. 53.5KG
S L10
108 LBS. 49KG
S L12
100 LBS. 45.4KG
TOOLS REQUIRED
POWER DRILL
PENCIL
TAPE MEASURE
HARDWARE
(by others)
LEVEL
PLIERS
HEX WRENCH
SCREWDRIVER
Draper, Inc. | 411 S. Pearl St. Spiceland, IN 47385
draperinc.com | 765.987.7999 | 800.238.7999
© 2022 All Rights Reserved | FORM: ScissorLiftSL_Inst22
Scissor Lift SL
Ceiling-recessed video projector lift
INSTRUCTIONS
INSTALLATION & OPERATION
If you have any difficulties installing or servicing your
Scissor Lift SL, call your dealer or Draper, Inc.
Question and Answer IconNeed help?

Do you have a question about the Draper SL and is the answer not in the manual?

Draper SL Specifications

General IconGeneral
BrandDraper
ModelSL
CategoryScissor Lifts
LanguageEnglish

Summary

Overview - Components

Overview - Planning

Safety Information

General Safety Warnings

Summarizes crucial safety warnings regarding shock, burns, fire, and electrical hazards during operation.

Installation and Operation Precautions

Outlines essential precautions for installation, handling, and safe operation of the lift apparatus.

Section 1 - Hanging Unit

Hanging Unit Installation Guidelines

Key guidelines for securely mounting the lift unit, ensuring adequate support and structural integrity.

Control System Options Overview

Details various control system options, including standard, multiple station, and key-operated switches.

Section 2 - Operation

Initial Operation and Home Location Setup

Steps for initial unit operation, testing, and setting the home location for lift controls.

Lift Operation with Control Systems

Explains how to operate the lift using standard and optional control systems for movement.

Section 3 - Adjusting for Level or Center of Gravity

Adjusting Projector Pan Position

Describes the preferred method for adjusting the projector pan to set level and center of gravity.

Adjusting Lifting Cable Bar

Details the secondary method for adjusting the lifting cable bar for proper alignment.

Section 4 - Installing Projector

Projector Mounting and Size Guidelines

Provides guidelines for projector mounting, including size limitations and screw selection.

Section 5 - Attaching Universal Projector Mount to Projector Pan

Universal Projector Mount Installation

Instructions for attaching the optional universal projector mount to the projector pan.

Section 6 - Installing Optional Environmental Air Space Housing

Environmental Air Space Housing Assembly

Steps for assembling and installing the optional housing to isolate the lift in air spaces.

Optional Ceiling Trim Kit Installation

Instructions for installing the optional ceiling trim kit for housing integration.

Section 7 - Installing Ceiling Closure

Ceiling Closure Panel Installation

Details on installing the ceiling closure panel, including adjustments and securing methods.

Ceiling Closure Safety Measures

Safety recommendations for ensuring proper installation and function of the ceiling closure.

Section 8 - Connecting Controls to Data Cable Splitter Board

Data Cable Splitter Board Connections

Guide to connecting lift controls to the data cable splitter board using specified cables.

Remote Control and RS232 Interface

Information on connecting remote controls, wall switches, and RS232 serial control interfaces.

Section 9 - Clearing and Resetting Show Position

Clearing Current Show Position

Procedure to clear the existing show position before setting a new one.

Setting New Show Position

Steps for setting a new desired show position, including calibration cycle.

Section 10 - Optional Delay Feature

Optional Delay Feature Operation

Instructions for operating and adjusting the optional delay feature for lift control.

Section 11 - Electrical Connections

Electrical Power and Wiring Requirements

Details on power supply, wiring, and adherence to electrical codes for lift installation.

Field Wiring and Initial Testing

Procedures for making field electrical connections and performing initial tests before final assembly.

Section 12 - Operation

Initial Unit Operation and Testing

Guidance on performing the first operation cycle and testing the lift's functionality.

Operating Lift with Various Controls

How to operate the lift using different types of control systems available.

Section 13 - Testing Safety Limit Switches

Safety Limit Switch Functionality Test

Method for testing the safety limit switches to ensure they are functioning correctly.

Section 14 - Adjusting Limit Switches

Adjusting the Fully Down Limit Position

Instructions on how to manually adjust the fully down limit switch for maintenance.

Limit Switch Adjustment Precautions

Important warnings and recommendations regarding limit switch adjustments to prevent improper operation.

Section 15 - Wiring Schematic

Lift Wiring Schematic Diagram

A visual representation of the lift's internal wiring connections and schematic.

Section 16 - Dimensions

Lift and Closure Dimensions

Provides key dimensions for the lift models and optional closure sizes.

Scissor Lift Inspection and Maintenance

Recommended Annual Maintenance Schedule

Outlines the recommended annual inspection and maintenance schedule for the Scissor Lift.

Related product manuals