0086-29-88763980 to describe the failure phenomenon, instead of operating by yourself.
VII. Storage and transportation
Instruments packed should be stored inside the room, with the temperature within the
℃, relative temperature not exceeding 90%, non-corrosive gases and
well-ventilated condition. In the process of transportation, they should be free of moisture, and
handled with care.
VIII. Accessories
DW-RE-52AA should be equipped with a 24-port / 250ml rotation bottle and a 500ml ball-milling
port collection bottle.
In case of needing flasks of other specification, the customer should purchase otherwise.
IX. Packing List
Principal machine
(including: control
box, the head, lifting
column, base of
Water bath tank (connected to
the
right side of principal machine)
Stainless steel bracket circle
Stainless steel ball-
milling
mouth clip
Charging pipe with valves
Installation:
1. After unpacking, check according to the packing list, clean and dry pieces of glass and put
them in place according to the position of pictures. On the left side should be the body of
principal machine, with the water tank container on the right side.