EasyManua.ls Logo

Dreamline FLEX Series - Installation Steps; Initial Frame Assembly

Default Icon
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© DreamLine
All Rights Reserved
© DreamLine
All Rights Reserved
© DreamLine
All Rights Reserved
© DreamLine
All Rights Reserved
Installation steps
7
FLEX 42x72 48x72 54x72 60x72 60x58 Shower and Tub Door manual Ver 1 Rev 4 072019
©2019 DreamLine. All Rights Reserved
60” model
◾SHDR-22427200-01 / SHDR-22487200-01 / SHDR-22547200-01: Insert the end that is closer to
the pivot hole
◾SHDR-22607200-01: Insert the end that is farther from the pivot hole
!
!
Fig 1
top
bottom
outside inside
outside inside
pivot
hole
Right hand door installation shown
door
pivot
hole
insert
this end
42” and 48” model
door
23-5/8”
23-5/8”
Insert the correct end of
the pivot rail based on the
model size. (See below)
*The pivot hole is very close to center
on the 54” model size. Double check
the dimensions before inserting the rails
54” model*
23-5/8”
23”
pivot
hole
pivot
hole
insert
this end
insert
this end
1. Insert the Top & Bottom Pivot Rails (#15) into the expandable rails of the Stationary panel
Assembly (#02). (Fig 1)