13
3.4 Before starting up engine the following must be checked
• Pump oil (use only oil prepared for use in oil bath drive plunger & piston high
pressure pumps)
PRE-OPERATION CHECK and SET-UP PROCEDURES
• Cold water supply
• Hose, wand and nozzle
• Water filter (intact, non-restrictive)
• Engine fuel (unleaded 86 octane or higher)
• Engine oil (SAE 10W30)
• Burner fuel; authorized LPG tank
3.5 Set up procedures
1. Attach water hose to inlet connector. Minimum flow should be based upon the specs of
the machine.
2. Attach high pressure hose using quick coupler. Lock coupler securely into place by
pulling back coupler collar and inserting it onto discharge nipple and then pushing collar
forward to lock in place.
3. Check oil level on sight glass on the side of the pump. Oil should be visible one-half way
up sight glass. The oil level can also be checked by using the dipstick on the top of the
pump.
4. Fill gasoline tank and check engine oil.
5. Fill LPG tank. Do not confuse gasoline and LPG tank. Keep proper fuel in propane tank.
6. Properly install the “D” batteries making sure that the batteries are mounted as shown on
the cap for the battery box.
4. Installation / Operation
4.1 Start up engine and the machine