EasyManuals Logo

E-Z-GO 2Five User Manual

E-Z-GO 2Five
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #88 background imageLoading...
Page #88 background image
Read all of this manual to become thoroughly familiar with this vehicle. Pay particular attention to all Notices, Cautions, Warnings, and Dangers.
80 2Five Owner’s Guide
MAINTENANCE PROCEDURES
Wheel Installation
To reduce the possibility of component damage, do not tighten
lug nuts to more than 85 ft. lbs. (115 Nm) torque.
It is important to follow the ‘cross sequence’ pattern when installing
lug nuts. This will assure even seating of the wheel against the
hub.
With the valve stem to the outside, mount the wheel onto the hub
with lug nuts. Finger tighten the lug nuts (1) in a ‘cross sequence’
pattern. Tighten the lug nuts to 50 to 85 ft. lbs. (68 to 115 Nm)
torque in 20 ft. lbs. (27 Nm) increments following the ‘cross
sequence’ pattern.
Valve Stem Cap
Cross Sequence
Tire style may vary
1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the E-Z-GO 2Five and is the answer not in the manual?

E-Z-GO 2Five Specifications

General IconGeneral
BrandE-Z-GO
Model2Five
CategoryElectric Vehicles
LanguageEnglish

Related product manuals