TABLE 5-3. Function Codes (continued)
Func.
Code
Level 1
Main Menu
Level 2
Sub-Menu
Level 3
Parameter
Security Level Factory
Setting
Key Entry Limit
Read Edit Reset Low High
21 Metering Forward Demand 021 Fwd Compensated
Voltage High
XXX.X Volts
(Date / Time shown)
0 NA 1 NA NA NA
This is the highest value of the calculated secondary voltage at the center of regulation (since the last reset), as a demand
value, according to the demand time interval at FC 46.
The forward line-drop compensation settings for resistance and reactance (FC 4 and FC 5) are used in this calculation.
Date and time of the occurrence of the highest compensated voltage is displayed.
21
Metering Forward Demand 021 Fwd Compensated
Voltage Low
XXX.X Volts
0 NA 1 NA NA NA
This is the lowest value of the calculated secondary voltage at the load center (since the last reset), as a demand value,
according to the demand time interval at FC 46.
The forward line-drop compensation settings for resistance and reactance (FC 4 and FC 5) are used in this calculation.
Date and time of the occurrence of the lowest compensated voltage is displayed.
21
Metering Forward Demand 021 Fwd Compensated
Voltage Present
XXX.X Volts
0 NA NA NA NA NA
This is the present value of the calculated secondary output voltage of the load center, as a demand value, according to the
demand time interval at FC 46.
The forward line-drop compensation settings for resistance and reactance (FC 4 and FC 5) are used in this calculation.
22 Metering Forward Demand 022 Forward Load
Current High
XXX.X A
(Date / Time shown)
0 NA 1 NA NA NA
This is the highest value of the load current (since last reset), as a demand value, according to the demand time interval at
FC 46.
Date and time of the occurrence of the highest load current is displayed.
22
Metering Forward Demand 022 Forward Load
Current Low
XXX.X A
(Date / Time shown)
0 NA 1 NA NA NA
This is the lowest value of the load current (since last reset), as a demand value, according to the demand time interval at
FC 46.
Date and time of the occurrence of the lowest load current is displayed.
22
Metering Forward Demand 022 Forward Load
Current Present
XXX.X A
0 NA NA NA NA NA
This is the present reading of the load current as a demand value, according to the demand time interval at FC 46.
41
CL-6 SERIES CONTROL INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MN225016EN January 2016

Table of Contents

Other manuals for Eaton 600 A 25 kV class PUSH-OP

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton 600 A 25 kV class PUSH-OP and is the answer not in the manual?

Eaton 600 A 25 kV class PUSH-OP Specifications

General IconGeneral
BrandEaton
Model600 A 25 kV class PUSH-OP
CategoryCables and connectors
LanguageEnglish

Related product manuals