EasyManuals Logo

Eaton Green Motion Building Quick Start Guide

Eaton Green Motion Building
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
L1
PE
N
L2
L3
Figure 1. Drilling plan for the Green Motion Building with
dimensions (mm)
Figure 2. The Green Motion
Building non-T2S version with
fixing screws and gaskets
Figure 2a. The Green Motion
Building T2S version with
fixing screws and gaskets
Figure 5. AC grid connectors inside Green Motion Building
Figure 6. Two-step process to remove the plug
Figure 4. Location of the eight screws of the Green Motion Building
housing
L1
L2
L3
N
PE
L1
L3
N
PE
1
2 3 4
Figure 3. Green Motion Building EV charger wiring
190.5 mm (7.5 inch)
206 mm (8.1 inch)
1
1
1
1
1
1
1
1
Table 1. Configuration to limit
maximum capacity of the EV charger
1
2
1
2
Green Motion Building
version: 22 kW
Switch position
16 A
20 A
26 A
32 A
Figure 7. QR code for the
installation checklist online form
Figure 8. QR code for Wi-Fi
hotspot credentials
Do not throw this document away: Keep it in a safe place.
Never turn on equipment when there is evidence of re or structural damage.
Green Motion Building must be installed only by professional and qualied personnel.
EATON Green Motion Building March 2023© 2023 Eaton
All Rights Reserved
Number
Description
1
Grid
2
Circuit breaker
Number Description
1
dia.6 mm screw
Number Description
1
dia.6 mm screw
Number Description
1
Green Motion Building EV charger
2
Plug
Number
Description
3
Type A RCD in accordance with
IEC61851-1:2017
4
Green Motion Building
Prior to installation, the step-by-step instructions from the latest installation and user manuals
must be downloaded (www.eaton.com/greenmotionBuilding), read and understood.
Eaton Green Motion Building EV charger
Quick-start guide
2. Electrical connections and unit switch-on 1. Preparation and mounting
During installation, unplug Green Motion Building. Read and understand the safety instructions and warnings prior to installation.
Floor-mounted column (optional),
Cable holder (optional).
Ethernet Connection Kit
Mounting the Green Motion Building on the wall
Use a spirit level to place the drilling template on the wall.
Make sure the top of the template is 1500mm above ground level for
optimal accessibility.
Mark the holes with a pencil and remove the installation template.
Drill four holes in the wall corresponding to the mounting slots of the
Green Motion Building, as shown in Figure 1.
Place four gaskets around the four slots on the outside of the unit, as
shown in Figure 2.
Mount the unit on the wall using 4x dia. 6 mm screws.
The appropriate type of plastic plugs and screws must be selected by
a professional installer, based on the following considerations:
the installation location,
the type of wall.
Mounting the Green Motion Building on the
column (optional)
For instructions on how to install the Green Motion Building on
a oor-mounted column, please refer to the Green Motion Building
documentation on www.eaton.com.
Installation checklist for Eaton Green Motion chargers
Please visit the link or scan the QR code (Figure 7) to ll in the
installation checklist form:
https://content.eaton.com/en-gb-installation-checklist-ev-chargers
Instructions
The Green Motion Building is intended for indoor or
outdoor installation.
The optimal operating temperature range for the unit is
-25 °C to +45 °C.
The unit must be transported and stored in indoor locations at
a temperature between -25°C and +45°C.
The unit must be used and stored in locations with a relative
humidity below 95%.
The unit must be used below a maximum altitude of 2000m
above sea level.
The unit must be used in locations that are free from acids,
gases and other corrosive substances.
For wall-mounted units, the surface of the wall must be able to
bear the unit's weight (max. 8kg).
If any accessories are missing, contact your Eaton technical
support representative using the email address
BGTechSupport@eaton.com.
The contents of the Green Motion Building box
Green Motion Building EV charger,
Quick-start guide,
Safety guidelines,
EV connector, depending on the customer conguration:
Type 2 connector with cable (Mode 3),
Type 2 connector with female socket (Mode 3),
Four adhesive gaskets,
Drilling template,
Spacers (T2 with shutter model),
Limiting maximum capacity
You can limit the output power of the Green Motion Building through
the switch DP1 located on the rear of the front cover.
Refer to Table 1 to select the appropriate conguration of the unit
depending on the maximum capacity of your electrical installation.
Switching on the unit
For wall-mounted Green Motion Home units: Check that the unit is
correctly xed to the wall in accordance with local regulations.
For column-mounted units: Check that the unit and the column are
correctly installed in accordance with local regulations.
Check that the AC GRID connections have been made correctly in
accordance with local regulations.
Perform continuity checks on the connections of the protective
conductor, insulation resistance, RCD triggering current, triggering
time etc., in accordance with local regulations.
Verify that the housing cover is closed and secured with the
xing screws.
If the checks listed above were successful, proceed as follows:
Switch on the AC GRID circuit breakers.
Wait for the LED light to turn on.
Conguring and commissioning the charger
Refer to the installation manual for instructions on conguration and
commissioning steps.
To remove the plug from the charger, pull the plug vertically then
horizontally as indicated in Figure 6.
Standard wiring
Each EV charger must be connected via a separate RCD
(Residual Current Device/fault-current circuit breaker) if
required by local regulations. No other consumers may be
connected to this circuit (Figure 3).
Refer to the installation manual and local standards for further
details on requirements in terms of circuit breakers and
minimal cross-sections of conductors.
Electrical connections and terminals
Open the housing of the Green Motion Building by unscrewing
the eight screws as indicated in Figure 4.
When removing the cover of the unit, please make sure to not
break any cables from the electronic board.
Disconnect the connection cables from the front cover.
Insert the power supply cable from the bottom of the unit.
Remove the cable glands, if necessary.
The electrical connection is made on the power supply
terminals located at the bottom-right of the unit's electronic
board (Figure 5).
If using a three-phase power supply, connect the phases (L1,
L2, L3), neutral (N) and earth (PE) wires of the AC (distribution)
grid to the power supply terminal block, ensuring correct
assignment (Figure 5).
If using a single-phase power supply, connect the phase (L1),
neutral (N) and earth (PE) wires of the AC (distribution) grid to
the power supply terminal block, ensuring correct assignment
(Figure 5).
It is prohibited to connect the unit to a grid circuit with
a three-phase IT grid configuration

Other manuals for Eaton Green Motion Building

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton Green Motion Building and is the answer not in the manual?

Eaton Green Motion Building Specifications

General IconGeneral
BrandEaton
ModelGreen Motion Building
CategoryBattery Charger
LanguageEnglish

Related product manuals