EasyManua.ls Logo

EC POWER XRGI 9 - Page 3

Default Icon
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
XRGI
®
- INSTALLATION GUIDE VERSION 1.0 2018
3
4. ASSEMBLY 32
4.1 SCOPE OF DELIVERY CHECK – XRGI® SYSTEM 32
4.1.1 XRGI® ORIGINAL ACCESSORIES 32
4.2 TRANSPORT AND HANDLING 32
4.3 INSTALLATION ROOM 33
4.3.1 FOUNDATION 33
4.3.2 ROOM TEMPERATURE/DUST 33
4.3.3 NOISE AND VIBRATION 33
4.3.4 CORROSIVE AMBIENT CONDITIONS 34
4.3.5 REQUIRED AIR INLETS 34
4.3.6 REMOTE DATA MONITORING 34
4.4 DIMENSIONS AND CONNECTIONS 35
4.4.1 XRGI® 6/9-SYSTEM 35
4.4.2 XRGI® 15/20-SYSTEM 38
4.5 REQUIRED MINIMUM CLEARANCES – ASSEMBLY & MAINTENANCE CLEARANCES 41
4.5.1 XRGI® 6/9-SYSTEM 41
4.5.2 XRGI® 15/20-SYSTEM 42
4.6 INSTALLATION OF THE XRGI® SYSTEM 44
4.6.1 SOUND INSULATION 44
5. INSTALLATION 45
5.1 HYDRAULIC INSTALLATION 45
5.1.1 EC POWER STANDARD HYDRAULIC SYSTEM 45
5.1.2 INSTALLATION Q-HEAT DISTRIBUTOR – POWER UNIT 49
5.1.2.1 PRIMARY CIRCUIT – FLOW AND RETURN CONNECTION 49
5.1.3 INSTALLATION Q-HEAT DISTRIBUTOR – STORAGE TANK/CONSUMER NETWORK 50
5.1.3.1 SECONDARY CIRCUIT – FLOW AND RETURN CONNECTION 50
5.1.3.2 EC POWER STORAGE TANK 51
5.2 EXHAUST GAS SIDE INSTALLATION 52
5.2.1 EXTERNAL EXHAUST HEAT EXCHANGER 52
5.3 GAS SIDE INSTALLATION 53
5.3.1 GAS HOSE CONNECTION 53
5.4 ELECTRICAL INSTALLATION 54
5.4.1 POWER UNIT 54
5.4.2 Q-HEAT DISTRIBUTOR 54
5.4.3 iQ-CONTROL PANEL 54
5.4.4 POWER FACTOR CORRECTION 56
5.5 NETWORK INSTALLATION 56
5.5.1 STORAGE CONTROL 56
5.5.2 FLOW MASTER CONTROL 57
5.5.3 FLOW MASTER 57
5.5.4 BOILER CONTROL 58
5.5.5 VPP GATEWAY / ELECTRIC HEATER CONTROL 59
5.5.6 MODBUS GATEWAY 59
5.5.7 LOAD SHARER S 60
TABLE OF CONTENTS