EasyManua.ls Logo

ECI Hi-FOCuS 960E - User Manual

Default Icon
61 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
960E Installation Manual
ECI Telecom Ltd. Proprietary i
Hi-FOCuS™
960E
Installation
Manual

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the ECI Hi-FOCuS 960E and is the answer not in the manual?

Summary

System Overview

Platform Description

Detailed description of the ECI 960E platform and its capabilities.

External Interfaces and Indicators

Overview of the 960E's front panel, chassis, and connection interfaces.

Installation Overview

Installation Workflow

Provides an overview of the tasks required for installing the 960E.

Site Preparation and Pre-Installation

Preliminary Site Survey

Considerations for assessing the installation site, including environment and physical location.

Tools, Checklist, and Site Requirements

Required tools, checklist of items, and site preparation requirements.

Unpacking and Visual Inspection

Procedure for safely unpacking and visually inspecting the equipment for damage.

System Mounting

Shelf and Rack Installation

Instructions for removing the door, mounting the shelf, and rack installation.

Card Installation Procedures

Step-by-step guide for installing Line/NI, GPLT, and CFU cards.

Unit and Cover Installation

Procedures for installing the Central Filtering Unit and the front cover.

Cable Connecting

Ground, Power, Clock, and Alarm Connections

Connecting grounding, power, clock reference, and alarm cables.

Traffic Cable Connections

Connecting SFP, Fiber Optic, and Subscriber Copper cables.

Management Interface Connection

Connecting Ethernet cables for out-of-band management.

System Verification

Overall Installation Inspection

Review of cable distribution, connectors, sockets, and power supply.

Board Status Check

Procedures for checking board status and fan operation after power-on.

Powering-Up

Powering-Up and Down Procedures

Steps to power up the 960E and procedure for powering down the system.

Commissioning

Terminal Connection and Basic Configuration

Establishing terminal connection and setting basic parameters like IP address.

System Status and Version Verification

Checking shelf card population and SW/HW versions.

Maintenance

Fan Unit Replacement

Procedure for replacing the fan unit, including tools and steps.

Air Filter Management

Instructions for installing and removing the dust filter.

SFP Transceiver Handling

Procedures for removing and installing SFP transceivers.

Cables and Connectors

Alarm and Clock Interface

Details on clock reference and alarm connector pin assignments.

Data and Telecom Interface

Information on data, telecom, Ethernet, E1, and fiber optic connections.

Power Connector Specifications

Details on power range and the D-type 5W5 connector pin list.

LED Display Definition

Central Filtering Unit LEDs

States and definitions for the Power and Alarm LEDs on the CFU card.

Glossary of Terms and Acronyms

Acronym Table

Definitions of terms and acronyms used in the manual.

Specifications

Hi-FOCuS 960 E General Specifications

Details on dimensions, weight, environment, safety, EMC, and rack installation.

Card Power Consumption

Power consumption details for selected cards and the shelf assembly.

ECI Hi-FOCuS 960E Specifications

General IconGeneral
ModelHi-FOCuS 960E
Power SupplyDual redundant power supplies
Form FactorRack-mounted
CoolingFan-based cooling
ManagementCLI, Web-based, SNMP
TypeMSAP (Multi-Service Access Platform)
InterfacesDSL, Ethernet, Fiber
Humidity5% to 95% (non-condensing)