EasyManua.ls Logo

ECOTEST DKG-21 - Technical Maintenance

ECOTEST DKG-21
97 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 TECHNICAL MAINTENANCE
5.1 Technical maintenance of the dosimeter
5.1.1 General instructions
The list of operations performed during technical maintenance
(hereinafter called TM) of the dosimeter, the order and the peculiarities of
operational phases are presented in Table 5.1.
Table 5.1 - List of operations during technical maintenance
Operations
TM type
OM item
No.
during
During
long-term
storage
everyday
use
periodical
use
(annually)
External examination
Delivery kit completeness check
Operability check
Power supply disconnection
Verification of the dosimeter
+
-
+
-
-
+
+
+
+
+
+
+
+
+
+
5.1.3.1
5.1.3.2
5.1.3.3
5.1.3.4
5.2
Note. “+” means the operation is applicable for this type of TM; “-
means the operation is not applicable.

Related product manuals