5 TECHNICAL MAINTENANCE
5.1 Technical maintenance of the dosimeter
5.1.1 General instructions
The list of operations performed during technical maintenance
(hereinafter called TM) of the dosimeter, the order and the peculiarities of
operational phases are presented in Table 5.1.
Table 5.1 - List of operations during technical maintenance
External examination
Delivery kit completeness check
Operability check
Power supply disconnection
Verification of the dosimeter
Note. “+” means the operation is applicable for this type of TM; “-”
means the operation is not applicable.