EasyManua.ls Logo

Edco SEC-NG - Operating Instructions: Tool Loading; Procedure for Loading Grinding Tools

Edco SEC-NG
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 7
SECNG -I-1217
E-SPTS-I-0809
800-638-3326 • edcoinc.com • techsupport@edcoinc.com
EQUIPMENT DEVELOPMENT CO., INC.
Operating Instructions
1. LOADING TOOLS:
Lean the machine back on the handle to expose the
work area and load the proper tools for your job. Electric
machines should be unplugged.
LOADING TOOLS:
Once all tools are in the proper position return the ma-
chine to the upright position. Remember if you are using
tools with PCD’s or Strip-serts they have a leading edge
and must be loaded as such. Also, remember the disc
turns in the direction of arrow decal.
Take care when loading tools. Edges of pockets are
sharp.
NOTE: The above illustration are viewing the Machine from the front bottom.
NOTE: the direction of rotation.

Related product manuals