EasyManua.ls Logo

Edgetech 2000 Series - Page 27

Default Icon
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Model2000
Serie
s
DewPrime
Dew
Point
Hygrometers
-----------Installation
Procedures------------
R.OW
CONTROL
PRESSURE
REGULATOR
(IF
REaD)
Fl.t:IN
CONTROL
BYPASS
R.OW (IF
REO'D}
INCREASED TOTAL
SMoFLE
R.ON FOR
FASTER
RESPONSE
EXHAUST
Figure2-1.
Suggested
sampliDg
system
.
the
installation,
and the user must ensure
that
no
portion
of the sample line is at a temperature lower thanthe
highest dew point
anticipate
d
If
electrical
heater
lines
are
used
,
it is usually
sufficient
to connect themto
a
variable
transformer
to adjust
the
heating
level
If
the sample lines
are long,
it
may be desirable to
wrap
them
in
insulation
to minimize the
amo1m.t
ofheat required for
preheating
.
The
Senso
r
temperature must always
be
maintained
at least 5°C above the dew point temperature
of the gas
sample
.
The
temperature
ofthe
Sensor
must
not
exceed+
1
00°C.Heating
the Sensor and sample
lines
above the dew point of the
gas
sample does not
change
the dew point of the
sample
.
2.10 SELECTION OF COMPONENTS
AT
LOW DEW
POINTS
Whenmeasuring dew-points below
-l8°C,
increased
attention to sampling
details
must
be
made
as
th
e
dew
point
is
lowered.
Rubber,neoprene,
tygon, andmost plastic tubing
are
lm.desirable
for use
in
hygrometer
system
s
as sample
lines from the
sampling
system to the
Sensor.
Specifi-
cally,
nonhygroscopic
tubing,such as
stainless
steel
,
Teflon, or
KEL-F
,
with a minimum of
joints,
fittings,
and other plumbing, is
recommended.
The
actual
selection of the sample line material should be based
on
2-4