EasyManua.ls Logo

ekwb EK-Quantum Kinetic TBE D5 PWM - Testing the Loop

ekwb EK-Quantum Kinetic TBE D5 PWM
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 18 -
TESTING THE LOOP
To make sure the installation of EK components was
successful, we recommend you perform a leak test for 24
hours.
When your loop is complete and filled with coolant,
connect the pump to a PSU outside of your system. Do not
connect power to any of the other components. Turn on
the PSU and let the pump run continuously. It is normal for
the coolant level to drop during this process as air collects
in the reservoir.
Inspect all parts of the loop, and in the eventuality that
coolant leaks, fix the issue and repeat the testing process.
Ensure that all hardware is dry before the system is
powered on in order to prevent any damage.

Related product manuals