EasyManua.ls Logo

Elecro Engineering EVOLUTION - Heater Positioning; Floor Mounting; Wall Mounting

Default Icon
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.elecro.co.uk
2
Positioning
Your heater should be horizontally or vertically sited allowing sucient
space for pipe connections and wiring, it should be screw xed securely to
a rm base or wall.
NOTE: See gure 2 for details of the foot arrangement when securing
to the wall or oor.
The heater should be installed at a low point in the ltration system.
It should be positioned downstream of (after) the lter and upstream of
(before) any dosing or other water treatment plant. (see g.3)
NOTE : If the ow direction is reversed (explained later in this
booklet) the heater must remain sited after the lter.
Factory set oor
mount ‘Foot position
To reset for wall
mount option,
undo the bolts and
re-assemble in the
vertical position as
shown.
Floor mount ‘Foot position’
Wall mount ‘Foot position’
Fig 2.
ENGLISH

Related product manuals