EasyManua.ls Logo

Enapter Electrolyser Quick Start Guide

Enapter Electrolyser
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Quick Start Guide
1
Download the Owners Manual
Electrolyse
EL 4.0
Enapter makes dierent versions of
electrolyser based on your needs.
Electrolysers come in AC/D
or DC/DC versions as well as air-
cooled or liquid-cooled versions (LC).
All informaon about Enapter devices can be
found at handbook.enapter.com
Contact support at support@enapter.com.
For indoo
use only
For humid environments
addional IP68 protecon
required
Check all parts for
damage regularl
Device out-of-the-box comes in Maintenance mode
Yellow LED should be steady. Do not leave it turned on and
unaended for a long me.
Follow Installaon Instrucons i
the Owners Manual
2
Insert the two supplied
j
umpers into the Dry Con. port
in the
3
rd and 4th posions on the front panel of the
EL. If you want/need to implement a safety chain
,
please refer to Dry Contact Connecon
G
uide in the
owner
'
s manual.
Plug the power cable into the
P
ower port
and switch the power on.
AC
protecve earth on the le
,
live on the right
DC
posive on the top.
Screw supplied antenna to the Ant. port.
Dry Con.
2
1
3
4
G N
L
Y
ou must follow owner
'
s manual for all steps
,
including
pipe and wire connecon
,
operaon
,
transportaon
,
storage and disposal.
3 W
ater Inlet
R
e
q
uirements
H2
O I
N
port is used for automac re
lling from connected
demineralised water source during normal operaon
,
rst re
lling
and maintenance. During hydrogen producon water consumpon
rate is around
400
mL/hr.
С
onnect electrolyser to water suppl
only through water puri
caon system
according to the
O
wner
s
M
anual.
W
ater
conducvity must be
<
2
0
µ
S/cm (at
2
C) and pressure between of 1-
4
bar.
H2
O I
N
P
roper inlet water source must be connected before
proceeding to the next steps.
Flush all water pipes with demineralised water before
connecng your device to ensure nothing is stuck in the lines.
4
Check
H2
V
ent and O
2
V
ent Lines
It is the installer
'
s responsibility to regularly check and maintai
H2
V
E
N
T
and O
2
V
E
N
T
lines
,
as well as keeping the lines free of ice
and any obstrucons.
M
ake sure there is no
obstrucon into the
H2
V
E
N
T
line.
T
his can cause irreparable
damage to your hydrogen
system
H2
V
E
N
T
O
2
V
E
N
T
N
o blockage should be present
on O
2
V
E
N
T
on the user side of
the interface.
DO
N
O
T
connect
H2
V
E
N
T
line with O
2
V
E
N
T
line
Mixing these outputs is extremely dangerous.
Always check
H2
vent and O
2
vent lines for blockage and
damage.
U
se Enapter
W
ater
T
ank to solve the problem of
unstable water supply. It can be
lled manually with
prepared demineralised water as well as directly
connected to water source.
Enapter
W
ater tank deliveries pressure up to 2.
7
5
bar.
W
ater conducvity must be
<
2
0
µ
S/cm (at 2
C).
External Enapter
W
ater
T
ankOponal
Ant.
Cooling
W
ater ports (normally closed) are used for cooling the system
using water or a water glycol mi
x
ture. Check the manual to guarantee the
opmal temperature as a funcon of your
ow rate and ambient
temperature.
T
he required
ow rate is 1-2 L/min and input pressure can
'
t e
x
ceed
4
bar.
M
ake sure you are not reversing the I
N
and the
O
UT
.
Cooling Loop
R
e
q
uirementEL4.0 LC version
Guide version 1.1

Other manuals for Enapter Electrolyser

Question and Answer IconNeed help?

Do you have a question about the Enapter Electrolyser and is the answer not in the manual?

Enapter Electrolyser Specifications

General IconGeneral
BrandEnapter
ModelElectrolyser
CategoryTransformer
LanguageEnglish

Related product manuals