As a recommendation, check with your installer if the allowable export limit on site is appropriate to your system to avoid
future grid export violations.
This is only applicable if your site has a pre-dened power export limit which is set by your installer during the
commissioning of your Enphase Energy System.
If the solar PV system starts exporting power to the grid beyond the authorized export limit, the Enphase solar PV and
battery system is required to fully shutdown and notify the homeowner and installer.
To self-recover the system from a grid export limit violation through the Enphase App, click Restart Now.
1. Grid export limit violation: