As recommendations to homeowner in the event of an grid import limit violation:
• Check with your installer if the allowable import limit on site is appropriate to your system to avoid future grid import
violations
• Ensure that you turn-o signicant loads such as an EV charging point or heat pumps before you restart the
Enphase system to avoid any further overload of the cut-out fuse.
• Avoid turning-on high power devices all at the same time, this may result in an import limit violation.
2. Grid import limit violation:
This is only applicable if you have a battery on the site and it is charging from the grid.
In this case when the site starts importing power from the grid to charge the battery beyond the allowed import limit set
by the installer during system commissioning, the Enphase solar PV and battery system is required to fully shutdown and
notify the homeowner and installer.
To self-recover the system from a grid import limit violation through the Enphase, click Restart Now.