Step 4: Provide Water and Condensate Drain Connections
A two-pipe reverse return piping configuration is recommended as it equalizes the piping circuit lengths and delivers
even water flow to each unit. A direct return piping configuration may be used, but it may be difficult to achieve and
maintain proper water flow to the units.
An air vent must be installed in the water distribution system.
The supply and return water piping should be run through the wall or floor penetration and terminate with a ball valve.
The piping material used must comply with all local codes.
Refer to: System Cleaning and Flushing procedures.
Pipe Locations
Figure 2

Other manuals for Envision R-410A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Envision R-410A and is the answer not in the manual?

Envision R-410A Specifications

General IconGeneral
BrandEnvision
ModelR-410A
CategoryHeat Pump
LanguageEnglish