7.
Stabilize the pole by using six 2X4’s and placing two 50 lbs. bags of sand
on top to keep pole from shifting, periodically check the pole with level to
ensure that pole is vertical. See Figure 6.
8.
Let concrete cure for a MINIMUM of 48 hours (2 days).
Note: Periodically check pole with level to ensure that pole is vertical.
Figure 6
IMPORTANT!
Let concrete cure for a MINIMUM of 48
hours (2 days) before proceeding to the
next step. In humid climates or wet
weather, allow additional time for the
concrete to cure. Do not install anything
else until concrete is completely cured.
Sand bag
2 X 4’s
DO NOT DUNK ON THIS UNIT .
DO NOT HANG FROM ANY PART OF THIS
UNIT , INCLUDING THE BACKBOARD, RIM,
SUPPORT BRACES OR NET
.
4L-8152-00
W
ARNING
!
9