EasyManua.ls Logo

ESPEC SH-642 User Manual

Default Icon
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
ESPEC CORP.
Operation manual / Basic guide
Bench-top type
temperature (and humidity) chamber
SH/SU
40093040002G0
May 10, 2019
Question and Answer IconNeed help?

Do you have a question about the ESPEC SH-642 and is the answer not in the manual?

ESPEC SH-642 Specifications

General IconGeneral
BrandESPEC
ModelSH-642
CategoryClimate chamber
LanguageEnglish

Summary

Chapter 3 Part names and functions

Chapter 4 Operation preparation

4.1 Setting the specimen in place

Instructions for correctly placing specimens within the test chamber.

4.2 Applying voltage to a specimen

Guidance on applying voltage to specimens, especially when using external terminals.

Chapter 5 Inspection and maintenance

5.2 Inspection and maintenance items

An overview of key inspection and maintenance tasks for the chamber.

5.3 Inspection

Detailed procedures for performing various safety and operational inspections.

Chapter 6 Troubleshooting

6.1 Alarms and actions

Guide to understanding chamber alarms and the recommended actions to take.

6.5 List of alarms

A comprehensive list of all possible alarms and their meanings.

6.6 Troubleshooting

General guidance and common solutions for troubleshooting chamber problems.

6.7 Maintenance

Specific maintenance procedures, including fuse replacement and defrosting.

List of remaining risks (instructions for avoiding danger)

Safety Label Map for SH/SU-222, 242

Safety Label Map for 100V, 200V, 220V, and 230V AC Models

Safety Label Map for 115V AC Models

Safety Label Map for SH/SU-262, 242-5

Safety Label Map for SH/SU-242-5 Only

Safety Label Map for SH/SU-642, 662

Accessories and Spare Parts

Related product manuals