EasyManua.ls Logo

Everbilt 22042226 - Installation Steps; Mark Water Level; Turn Off Water Supply; Drain Toilet Tank

Everbilt 22042226
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
Installation
MARK WATER LEVEL TURN OFF WATER
MARK WATER LEVEL DRAIN WATER
1 2
3 4
Mark the water level (WL1) in the bowl with a pencil
Use a pencil to mark the water level 2A (WL2A).
Turn off the water supply (1).
Remove the water supply line from the bottom of the
Flush the toilet and mark residual water level 2B (WL 2B).
Measure and record the distance “L” from WL2A to WL2B.
Remove excess water from the tank with a sponge.
WL 1
2
1
WL 2A
WL 2B
L
WL 2A