EasyManuals Logo

Everflo EF2200-QA User Manual

Default Icon
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
Installation
10
assembly
working condition:
2. Test with
water
Test the system for leaks with water:
a) Fill the tank with water.
b) The pump is an “on demand” pump. When turned on, the pump will
prime itself, then turn off once reaching pressure. When the flow
continues, the pump will automatically re-start.
c) Check for leaks throughout the system. If a leak is detected, fix the leak
and re-test the system with water.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Everflo EF2200-QA and is the answer not in the manual?

Everflo EF2200-QA Specifications

General IconGeneral
BrandEverflo
ModelEF2200-QA
CategoryWater Pump
LanguageEnglish

Related product manuals