EasyManua.ls Logo

Evoqua WALLACE & TIERNAN S10k User Manual

Evoqua WALLACE & TIERNAN S10k
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
WALLACE & TIERNAN
®
GAS FEEDER
S10k
INSTRUCTION MANUAL

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Evoqua WALLACE & TIERNAN S10k and is the answer not in the manual?

Evoqua WALLACE & TIERNAN S10k Specifications

General IconGeneral
BrandEvoqua
ModelWALLACE & TIERNAN S10k
CategoryIndustrial Equipment
LanguageEnglish

Summary

Safety Guidelines for the S10k System

Intended Use and System Limitations

Defines the specific applications and prohibited uses for the S10k gas feeder system.

General Safety Instructions for Operation

Outlines general safety principles for installation, operation, and maintenance of the system.

Specific Safety Precautions for S10k System

Details specific safety measures related to chlorine gas handling and S10k operation.

Description of the S10k Gas Feeder

Principle of Operation

Explains how the system mixes gas with water using vacuum and flow control mechanisms.

Vacuum Demand Valve Functionality

Details the function, types, and critical warnings associated with the vacuum demand valve.

Injector Types and Specifications

Describes standard and anti-syphon injectors and their respective specifications.

Technical Data and Specifications

Provides essential technical specifications for system components and parameters.

Installation Procedures for the S10k System

Mounting the Flowmeter Assembly

Step-by-step instructions for assembling and mounting the flowmeter.

Connecting to a Gas Cylinder

Procedure for connecting the vacuum demand valve to gas cylinders.

Connecting to a Chlorine Drum

Guidance on the procedure for connecting the system to a chlorine drum.

Mounting the Injector

Detailed steps for mounting the injector and its associated parts.

General Checks Before Operation

Essential checks to perform before the plant can be taken into operation.

Injector Vacuum and Leak Check Procedure

Procedure for checking injector vacuum and detecting system leaks.

System Gas Leak Testing

Detailed procedure for testing the system for gas leaks.

Vacuum Demand Valve Check

Procedure to check the functionality and operation of the vacuum demand valve.

Final Commissioning Steps

Final procedures required for commissioning the gas feeder system.

Operating the S10k Gas Feeder

Starting the Gas Feeder System

Step-by-step guide for starting the S10k gas feeder system.

Changing Gas Cylinders Safely

Detailed steps for safely changing gas cylinders.

Maintenance and Inspection Schedule

Provides a schedule for regular maintenance and inspection tasks.

Operator's Maintenance Tasks

Routine maintenance tasks to be performed by the operator.

Quarterly System Checks

Procedures for system checks performed every three months.

Troubleshooting Common Issues

Troubleshooting guide for common system issues and their remedies.

Maintenance and Servicing of the S10k

General Maintenance Precautions

General precautions and safety guidelines for all maintenance operations.

Checking Injector Performance

Procedures to check and ensure proper injector performance.

Annual Maintenance Tasks

Tasks for annual maintenance, including system overhaul.

Two-Yearly Maintenance Schedule

Maintenance tasks to be performed every two years.

Cleaning the Injector

Procedures for cleaning the injector to ensure proper performance.

Related product manuals