EasyManua.ls Logo

Extreme Networks Extreme 7520-48Y-8C-AC-F User Manual

Extreme Networks Extreme 7520-48Y-8C-AC-F
117 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Extreme 7520 Hardware Installation Guide
9037389-00 Rev. AA
July 2023

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Extreme Networks Extreme 7520-48Y-8C-AC-F and is the answer not in the manual?

Extreme Networks Extreme 7520-48Y-8C-AC-F Specifications

General IconGeneral
Device TypeSwitch
Form FactorRack-mountable
Power SupplyAC
Forwarding Rate2.976 Bpps
Storage Temperature-40 °F to 158 °F (-40 °C to 70 °C)
LayerLayer 3
Product SeriesExtreme 7520 Series
Ports48 x 25 Gigabit SFP28 + 8 x 100 Gigabit QSFP28
Jumbo Frame Support9216 bytes
Operating Temperature32 °F to 104 °F (0 °C to 40 °C)
Humidity5% to 95% non-condensing
Switching Capacity4.0 Tbps

Summary

Power Supplies for Your Switch

Power Supply Module Installation Precautions

Provides crucial warnings and cautions for installing power supply modules.

Build Stacks

Understanding Switch Stacking

Explains how switches operate in a stack, primary switch role, and node definition.

Building Basic Switch Stacks

Describes native and alternate stacking methods for creating switch stacks.

Primary and Backup Switch Redundancy

Details how to configure redundancy for primary and backup switches in a stack.

Plan Your Stack Configuration

Switch Placement Recommendations for Stacking

Guidelines for physically situating switches for optimal SummitStack configuration.

Recommendations for Stack Software Configuration

Best practices for software configuration when deploying a new switch stack.

Set up the Physical Stack

Connect Switches to Form Stack Ring

Instructions on connecting switches using stacking cables for a stack ring.

Connect Stack to Management Network

How to connect the stack to a management console for configuration.

Site Preparation

Planning Your Installation Site

Outlines the three major parts of the site planning process for successful installation.

Operating Environment Requirements

Verifies that the site meets all environmental and safety requirements for equipment.

Controlling Equipment Temperature

Essential thermal recommendations for ensuring performance and safety of equipment.

Protecting Systems from ESD

Measures to protect the system from static electricity and ESD damage.

Grounding Equipment Racks

Procedures and guidelines for properly grounding equipment racks.

Securing the Equipment Rack

Instructions on how to properly attach and secure equipment racks to the floor.

Installing Network Cables

Key considerations and best practices for installing network cables.

Meet Power Requirements

Power Supply Connection Requirements

Recommendations and precautions for planning power supply connections for equipment.

Uninterruptible Power Supply (UPS) Requirements

Details UPS functions and requirements for switch power protection.

Install the Switch

Safety Considerations for Switch Installation

Crucial safety information to read before installing or removing switches.

What You Need for Switch Installation

Lists necessary tools, equipment, and preparation steps for switch installation.

Attaching Switch to Rack or Cabinet

Outlines the methods for attaching the 7520 Series switch to a standard 19-inch rack.

Four-Post Rack Mount Installation

Details the components and steps for mounting a switch in a four-post rack.

Two-Post Rack Mount Installation

Explains the configurations and steps for mounting a switch in a two-post rack.

Installing Optional Components

Instructions for installing pluggable transceivers and cables after rack mounting.

Installing Internal Power Supplies

Instructions for installing one or two 800W AC power supply units.

Install 800W AC Power Supply

Step-by-step guide to install an 800W AC power supply into the switch.

Install 800W DC Power Supply

Step-by-step guide to install an 800W DC power supply into the switch.

Connect DC Power Supply Ground Wire

Instructions for connecting the ground wire to a DC power supply.

Connect DC Power Supply to Voltage Source

Steps to connect a DC power supply to the -48V power source.

Turn On the Switch

Instructions for powering up the switch after installation.

Connect Network Interface Cables

Activate and Verify the Switch

Connect to Management Console

How to connect a PC or terminal to the switch's serial console interface.

Log In for First Time on Switch Engine

Initial login process for the Switch Engine operating system.

Configure Switch IP Address for Management VLAN

Steps to configure the IP address for the management VLAN on the switch.

Change Switch OS via Bootloader Menu

Procedure to change the switch OS to Fabric Engine via the bootloader.

Change Switch OS via Startup Menu

Method to change the switch OS to Fabric Engine via the startup menu.

Log In for First Time on Fabric Engine

Initial login process for the Fabric Engine operating system.

Remove and Replace Components

Monitor the Switch

Safety Information

Related product manuals