Do you have a question about the Extreme Networks Extreme 7520-48Y-8C-AC-F and is the answer not in the manual?
Device Type | Switch |
---|---|
Form Factor | Rack-mountable |
Power Supply | AC |
Forwarding Rate | 2.976 Bpps |
Storage Temperature | -40 °F to 158 °F (-40 °C to 70 °C) |
Layer | Layer 3 |
Product Series | Extreme 7520 Series |
Ports | 48 x 25 Gigabit SFP28 + 8 x 100 Gigabit QSFP28 |
Jumbo Frame Support | 9216 bytes |
Operating Temperature | 32 °F to 104 °F (0 °C to 40 °C) |
Humidity | 5% to 95% non-condensing |
Switching Capacity | 4.0 Tbps |
Provides crucial warnings and cautions for installing power supply modules.
Explains how switches operate in a stack, primary switch role, and node definition.
Describes native and alternate stacking methods for creating switch stacks.
Details how to configure redundancy for primary and backup switches in a stack.
Guidelines for physically situating switches for optimal SummitStack configuration.
Best practices for software configuration when deploying a new switch stack.
Instructions on connecting switches using stacking cables for a stack ring.
How to connect the stack to a management console for configuration.
Outlines the three major parts of the site planning process for successful installation.
Verifies that the site meets all environmental and safety requirements for equipment.
Essential thermal recommendations for ensuring performance and safety of equipment.
Measures to protect the system from static electricity and ESD damage.
Procedures and guidelines for properly grounding equipment racks.
Instructions on how to properly attach and secure equipment racks to the floor.
Key considerations and best practices for installing network cables.
Recommendations and precautions for planning power supply connections for equipment.
Details UPS functions and requirements for switch power protection.
Crucial safety information to read before installing or removing switches.
Lists necessary tools, equipment, and preparation steps for switch installation.
Outlines the methods for attaching the 7520 Series switch to a standard 19-inch rack.
Details the components and steps for mounting a switch in a four-post rack.
Explains the configurations and steps for mounting a switch in a two-post rack.
Instructions for installing pluggable transceivers and cables after rack mounting.
Instructions for installing one or two 800W AC power supply units.
Step-by-step guide to install an 800W AC power supply into the switch.
Step-by-step guide to install an 800W DC power supply into the switch.
Instructions for connecting the ground wire to a DC power supply.
Steps to connect a DC power supply to the -48V power source.
Instructions for powering up the switch after installation.
How to connect a PC or terminal to the switch's serial console interface.
Initial login process for the Switch Engine operating system.
Steps to configure the IP address for the management VLAN on the switch.
Procedure to change the switch OS to Fabric Engine via the bootloader.
Method to change the switch OS to Fabric Engine via the startup menu.
Initial login process for the Fabric Engine operating system.