EasyManua.ls Logo

Fakir KAAVE - Operating the Appliance; Brewing Process Steps

Fakir KAAVE
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating the appliance
14
Boiling process
1. Plug the power cable into a suitable socket.
2. When the water container [1] is placed in the
water container position [5], a short “beep” will
sound and the indicator light [6] will light up blue.
The light inside the water container will also light
up for a short period of time.
3. Now add the necessary amount of mocha, sugar
and water to the receptacle, depending on how
you like your
mocha and how many cups you wish to make.
4. Stir the mocha thoroughly with a wooden or
plastic spoon.
5. Place the container in its proper position. A short
“beep” will sound, the indicator lamp will light up
twice briey and the light in the water container
will light up for 5 seconds.
6. The brewing process starts when you press the
Start button [6].
Amount Time taken
1 cup 1 – 1.5 minutes
2 cups 1.5 – 2 minutes
3 cups 2 – 2.5 minutes
4 cups 3 – 3.5 minutes
Brewing times were determined under laboratory
conditions for 70 ml cups of mocha.
7. 3 short “beeping” sounds are heard at the end of
the brewing process. The light inside the water
contained will remain illuminated for 20 seconds
and the indicator light flashes blue.
8. Once the process is finished, you can serve the
mocha right away.
Note!
Clean the container after every use!

Table of Contents

Other manuals for Fakir KAAVE

Related product manuals