EasyManua.ls Logo

FDomes GLAMPING 20 - Page 4

FDomes GLAMPING 20
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
LIST OF THE SUPPLIED FOR THE STRUCTURE ASSEMBLY:
NAME OF THE COMPONENT QUANTITY
PHOTO
A PIPE 30 PCS
B PIPE 40 PCS
C PIPE 70 PCS
D PIPE 10 PCS
METAL BAND 15 PCS
FOOT 15 PCS
M12/50 SCREWS FOR LEVEL 0 AND
FRONT TRANSPARENT WINDOW
18 PCS
WASHERS FOR M12 CONSTRUCTION’S
SCREWS
62+6 PCS
M12 SCREW NUTS 62+6 PCS
TO BUILD THE FG20, FG30, FG30, FG40, FG50 YOU WILL NEED:
4 people,
a ladder of a minimum 4 m height,
a drill,
a 19 mm automatic wrench (impact gun),
an 8mm and a 5 mm Allen key,
a hammer,
3 ropes - 15 - 20 m long each,
a protective ground sheet at least: 6 x 4 m
(to unfold the membrane onto, before pulling
it onto the metal framework. It will protect
the membrane from getting dirty on bare ground).