EasyManua.ls Logo

Field Controls CK-63 User Manual

Default Icon
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
www. eldcontrols.com
Please retain these instructions after installation.
This device MUST be installed by a quali ed agency in accordance with the manufacturer's installation instructions. The de nition of
a quali ed agency is: any individual,  rm, corporation or company which either in person or through a representative is engaged
in, and is responsible for, the installation and operation of HVAC appliances, who is experienced in such work, familiar with all the
precautions required, and has complied with all the requirements of the authority having jurisdiction.
READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE PROCEEDING WITH THE INSTALLATION.
Installation Date:
Installed By: Phone:
120 VAC SYSTEM CONTROL KIT
Model: CK-63
Designed for use on SWG Series Power Vent Hoods for controlling oil  red heating appliances
with 120 VAC controls.
The CK-63 control has the ability to operate the oil burner motor (up to
1
3 HP) and the venter at the
same time. This allows for shorter post purge time. This feature requires the burner to be equipped
with a delayed oil solenoid valve, which is not supplied with this kit.
ITEMS INCLUDED IN KIT:
1- Junction box with mounted pressure switch solid state post purge control
1- 2' Length of
1
4" aluminum tubing
1-
1
4" tubing connector
1- Flexible conduit connector
1- WMO-1 Blocked Vent Switch
P/N 46400900 Rev P 08/19
(Replaces CK-61 & CK-62 models)

Questions and Answers:

Field Controls CK-63 Specifications

General IconGeneral
BrandField Controls
ModelCK-63
CategoryControl Unit
LanguageEnglish

Summary

Installation Guide

Mounting the Junction Box

Instructions for mounting the control kit's junction box, either at the venter or remotely.

Secondary Safety Switch

Recommendation for installing a secondary safety switch for blocked flue detection.

Mounting in the Vent Pipe

Procedure for installing the blocked vent switch into the vent pipe.

Pressure Switch Sensing Tube

Steps for connecting the sensing tube to the pressure switch.

Wiring Instructions and Diagrams

Electrical Ratings Overview

Details the voltage and amperage specifications for the CK-63 control kit.

Single Unit Wiring Diagram

Illustrates the wiring for a single oil-fired system unit.

Wiring with Electronic Primary

Shows wiring connections for systems with an electronic primary control.

ST9103 Control Board Wiring

Details typical wiring for warm air furnaces with a Honeywell ST9103 control board.

Multiple Oil Fired Systems Wiring

Diagram for wiring multiple oil-fired systems.

24V Gas Furnace Application

Wiring diagram specific to 24V gas furnace applications.

Riello Burner Application Wiring

Illustrates wiring connections for Riello burner applications.

Adjustments and System Checks

Pressure Switch Adjustment

Procedure for adjusting the pressure switch for optimal burner operation.

Post Purge Timing Adjustment

Guide to setting the post purge timer for the venter motor.

System Control Checkout

Steps to verify the correct operational sequence of system controls.

Maintenance and Troubleshooting

Troubleshooting Hints

Common issues and their solutions for the CK-63 control kit.

Replacement Parts List

Catalog of available replacement parts with corresponding part numbers.