EasyManua.ls Logo

Fimar MCD/950CS - Page 43

Fimar MCD/950CS
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 19 - English language
GB
C334606202.fmIDM
▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬ BELL PACKAGING MACHINE MCD
4. Insert the food product into bag.
5. Insert the bag into decompression chamber with the bag opening positioned on sealing
bar.
To package liquid products, fill the bag to the maximum level up to 50% of their ca-
pacity and position them so that the opening is on sealing bar , while the product
must be at a lower level, inside the chamber, thus avoiding the product discharge.
6. Lower holding bell and keep it in position until the equipment does not end up the seal-
ing cycle of the bag.
Operation with inert gas intake.
1. Connect the inert gas bottle to nozzle that is on one side of the equipment.
2. Press main switch (A) (MCD - MCD/S) or operate selector (N) (MCD/CS) to activate the
power supply of the equipment.
3. Press the button (B) to start the appliance.
4. Press buttons (E-F) to select the working programme.
5. Insert the food product into bag.
6. Insert the bag into decompression chamber with the bag opening positioned on sealing
bar.
SET
SET
MCD / CS
MCD - MCD / S
IDM-34606200702.pdf
C
L1H
F GE
C
DB L
L1H
F GEDBA L
P
M N
FIMAR-RUSSIA.RU +7 495 989 1055

Table of Contents

Related product manuals