EasyManua.ls Logo

Firesense 1902415 - Page 6

Firesense 1902415
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Contact us for assistance: (866) 985-7877 | www.balkenehome.com
ASSEMBLY
3
Attach the Lower Post
G
to the Post Supports
I
. Once
you have tightened the bolts holding the Post Supports
I
to the Base
J
, align the holes in the Lower Post
G
with the
holes on the tops of the Post Supports and insert a Large
Bolt
through the hole in the Post Support. Secure with a
Small Flange Nut
!
. Repeat this in the 5 remaining holes (6
holes total—2 for each Post Support piece). Hand tighten
initially then tighten with the Wrench
(
when all bolts
have been inserted.
Hardware Used: 6x Large Bolt
6x Small Flange Nut
!
4
Attach Upper Post
F
to Lower Post
G
by screwing the
two pieces of the post together.
Note: Bolts not needed to hold the posts in place.
5
Slide Tank Housing
D
over the assembled Upper/Lower
Posts
F
/
G
and down over the Post Supports
I
. Rest the
Tank Housing on the Base
J
.
6
Attach "¿to the top of the Head½
Assembly
C
. Insert 1 through 1 Large Flat
Washer
#½and into the hole on the top of the Head Assembly.¿
Tighten stud securely. Repeat with the other 2¿,gtgU¿³½-¿Å_¶¦
Hardware Used:
"
3x Large Flat Washer
#
6