EasyManua.ls Logo

First Co HBC - PRE-STARTUP CHECKS; Electrical Grounding and Safety Warnings; Thermostat and Switch Wiring Caution; Pre-Startup Unit Checklist

First Co HBC
11 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PRE-STARTUP CHECKS
10 HBC(X), PHBC(X), RHBC(X), CHBC(X): Installation, Operation, and Maintenance Instructions
PRE-STARTUP CHECKS
WARNINGS: Electrically ground fan coil. Connect ground wire to ground terminal
marked “GND”. Failure to do so can result in injury or death.
Do not touch any rotating component with any object. Damage to the
equipment and personal injury can occur.
CAUTION: Any device such as a fan switch or thermostat that has been furnished by
the factory for field installation must be wired in strict accordance with the
wiring diagram that is supplied with the unit. Failure to do so could result
in damage to components and will void all warranties.
Prior to starting the unit:
1. Ensure supply voltage matches nameplate data.
2. Ensure unit is properly grounded.
3. With power off, check blower wheel set-screws for tightness and ensure
blower wheels rotate freely and quietly.
4. Ensure fan coil is properly and securely installed.
5. Ensure unit is sloped toward drain line.
6. Ensure unit will be accessible for servicing.
7. Ensure condensate line is properly sized, run, trapped, pitched and tested.
8. Ensure all cabinet openings and wiring connections have been sealed.
9. Ensure a clean filter is in place and of adequate size.
10. Ensure all access panels are in place and secured.