- 7 -
START UP INSTRUCTIONS:
1. Set fuel selector valve according to gas supply to be
used.
2. Connect construction heater to gas supply with
approved hose assembly.
3. Plug the electrical cord into a 20 amp supply.
4. Open all gas supply valves.
5. Depress the main switch to the “START” position.
The fan will start and the burner should ignite.
Release switch to “RUN” position.
6. Set the Thermostat to the desired temperature.
7. If heater fails to ignite after 3 attempts call your
supplier for service.