EasyManua.ls Logo

Flott BSM 75 - Operation

Default Icon
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
370542 D/GB
27
GB
E. Operation
1.
Running test.
Make sure the belt running direction is correct.
(If not, please check the power connection.
Maybe the phases are false connected.)
2. Make sure earth lead is well installed.
3. Make sure foot stand is firmly fixed to the
working floor.
Indefinite
height adjustment
1. Unfasten the Interlock
Handle.
2. Unfasten the Locking Level.
3. Raise or lower the standing
arm to the desired position.
4. Fasten the Locking Level.
5. Fasten the Interlock Handle.
Belt tracking adjustment
1. Turn the adjusting handle (parts No.48)
upward to move the belt tracking system
to the left.
Turn the adjusting handle (parts No.48)
downward to move the belt tracking
system to the right.

Related product manuals