Startup
1. Ensure the abrasive outlet hose connects to the vessel and the cut
ting system.
2. Ensure that the abrasive level is above the silo low abrasive switch.
3. Turn on the air supply to the ADS.
4. Ensure that the PR1 gauge is at 5.5 bar (80 psi) and PR2 is at 2.8 bar (40 psi).
5. Turn on the power switch.
Shutdown
T
urn off the power switch.
© 2016–2017 Flow International Corporation