EasyManua.ls Logo

Flow Paser CF900 - Page 16

Flow Paser CF900
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Startup
1. Ensure the abrasive outlet hose connects to the vessel and the cut
ting system.
2. Ensure that the abrasive level is above the silo low abrasive switch.
3. Turn on the air supply to the ADS.
4. Ensure that the PR1 gauge is at 5.5 bar (80 psi) and PR2 is at 2.8 bar (40 psi).
5. Turn on the power switch.
Shutdown
T
urn off the power switch.
© 2016–2017 Flow International Corporation
Page 16 of 31

Related product manuals