EasyManua.ls Logo

Flower House SpringHouse - SpringHouse Setup Continued; Secure Greenhouse and Tie Downs

Flower House SpringHouse
5 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Self-erecting portable greenhouses Set up Instructions
Page 1
Step 1: Remove
your SpringHouse
from the pack.
Step 2: Allow your
SpringHouse™ to spring open.
Step 3: Unfold your
SpringHouse™ into 2 panels.
Step 4: Unzip the easiest
accessible doorway and screen.
Grab the center steel band and
lift up to separate the two sides
of your SpringHouse™.
Step 5: Stand on the bottom
corner of the skirting and lift
your SpringHouse over your
head. Push out on the center
steel band (Shown in fig. D) and
left up to separate the two sides
of your SpringHouse™.
Step 6: Stand pm the bottom
corner of the skirting and lift your
SpringHouse™ over your head.
Push out on the center steel band
(Shown in fig. D) and left up to
separate the two sides of your
SpringHouse™.
Step 7: Secure your
SpringHouse™ using the
supplied stakes. Insert the
stakes into the stake holes
of the skirt at 45° angles.
Step 8: You must secure your
SpringHouse™ using the High-wind tie-
downs. Insert one end of the rope through
the D-ring in the top corner, then through
the anchor. Knot the rope around a stake
and insert it in the ground at a 45° angle.
Keep as much tension on the rope as
possible. Repeat this step with all corner
locations, as well as the D-rings on the peak
ends and top center of the side walls.

Related product manuals