EasyManua.ls Logo

Freeflow Spas Excursion - User Manual

Freeflow Spas Excursion
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
x Page x x
Pre-Delivery Instructions
Please take the time to read this booklet carefully, as it will provide you with the information you will need to ensure
the safe, secure, and timely installation of your new spa. The following sections are guidelines on how to prepare for
delivery and set-up of your new spa. Specifically covered are site selection, delivery access, ground preparation, and
electrical requirements.
Remember to carefully review the Owners Manual that accompanies your spa, and to register the spa's warranty
within 10 days of delivery at freeflowspas.com/warranty.php The Owner's Manual can be found in the Owner’s
Package which has been attached to the filter ring of your spa.
Watkins Manufacturing Corporation reserves the right to change features, specifications and design without
notification and without incurring any obligation.
DATE PURCHASED: _________________________________________________________________
DATE INSTALLED: ___________________________________________________________________
DEALER: ___________________________________________________________________________
ADDRESS: __________________________________________________________________________
TELEPHONE: _______________________________________________________________________
In most cities and counties, permits will be required for the installation of electrical circuits or the construction of
exterior surfaces (decks and gazebos). In addition, some communities have adopted residential barrier codes which
may require fencing and/or self-closing gates on the property to prevent unsupervised access to a pool (or spa) by
children under 5 years of age. Your spa is equipped with a locking cover that meets the ASTM F1346-91 Standard
for Safety Covers and as a result, is usually exempt from most barrier requirements. As a general practice, your local
Building Department will inform you of any applicable barrier requirements at the time a permit is obtained for the
installation of an electrical circuit. Your dealer can provide information on which permits may be required.
Freeflow Spa Pre-Delivery Instructions
Congratulations on your decision to purchase a Freeflow spa.
Welcome to the growing family of Freeflow spa owners.
Question and Answer IconNeed help?

Do you have a question about the Freeflow Spas Excursion and is the answer not in the manual?

Summary

Pre-Delivery Instructions

Site Selection and Preparation

Outdoor and Patio Installation

Guidelines for preparing outdoor spa installation sites, focusing on foundation requirements.

Deck Installation

Requirements for installing a spa on a deck, emphasizing load capacity checks and structural integrity.

Indoor Installation

Special considerations for indoor spa placement, including flooring, drainage, and humidity management.

Delivery Access

Ground Preparation

Installation Notes

Important notes for homeowners regarding spa foundation preparation and leveling after installation.

Excursion, Solstice & Monterey Dimensions

Accent & Azure Dimensions

Calistoga Dimensions

Tristar Dimensions

Cascina Dimensions

Electrical Requirements

110 Volt Operation Requirements

Details on the dedicated 15 amp, 110 volt GFCI protected circuit needed for spa operation.

230 Volt Operation Requirements

Specifications for the 40 amp, 230 volt circuit and subpanel required for spa installation.

Services Available from Your Spa Dealer

Additional Products Available from Your Spa Dealer

Contractor Suggestions

Spa Specifications

Freeflow Spas Excursion Specifications

General IconGeneral
InsulationFull foam
Dimensions84" x 84" x 36"
Heater4kW
Shell MaterialPolyethylene
Cabinet MaterialPolyethylene
Warranty5 years
Seating Capacity5-6

Related product manuals