EasyManuals Logo

Friedrich Vert-I-Pak A-Series User Manual

Friedrich Vert-I-Pak A-Series
29 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
15
Wall Plenum Installation
Step 2 - Inside Wall Plenum Half
Caulk all 8
Flange Corners
and Unused
Holes
Detail A
1. Apply sealant to all 4 ange corners and unused holes. See Detail A.
2. Flash the inside of the rough opening to ensure the proper t and level.
3. Insert inside plenum half (Part B) into outside plenum half (Part A). Ensure that Part A does not back out of
the rough opening.
4. Remove the inside plenum half.
5. Apply sealant to the outside plenum half and insert into the rough opening to ensure a water-tight seal.

Other manuals for Friedrich Vert-I-Pak A-Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Friedrich Vert-I-Pak A-Series and is the answer not in the manual?

Friedrich Vert-I-Pak A-Series Specifications

General IconGeneral
BrandFriedrich
ModelVert-I-Pak A-Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals