EasyManuals Logo

Froling TURBOMAT TM 150 User Manual

Froling TURBOMAT TM 150
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
Edition 2003 B0310003 9
Start-up
Initial Start-up
The initial start-up must be carried out by an authorized installer or Fröling's customer service department!
Checking the Heating System:
1. Check all electrical equipment
2. Check to see whether the heating system has been completely vented.
3. Check to see whether all the safety devices are in place and ensuring they are functioning properly.
4. Check to see whether there is sufficient ventilation and venting of the boiler room.
5. Configure and set parameters
6. Prepare the Fuel
Fill the fuel storage room with waste-wood or pellets, depending on the type of system.
IMPORTANT! The conveyor in the storage room must be switched on during the filling process
7. Pre-heating: See description page 17
Pre-heat the system at low power until the combustion chamber has dried out.
Turn the temperature controller to 70°C!

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Froling TURBOMAT TM 150 and is the answer not in the manual?

Froling TURBOMAT TM 150 Specifications

General IconGeneral
BrandFroling
ModelTURBOMAT TM 150
CategoryWater Heater
LanguageEnglish