Additional charging amount for Twin type
L1L3
L2
Pre-charge length < L1 + L2 + L3
The additional charging amount will be calculated as follows.
A: Piping length (m) of liquid pipe with outside diameter of 12.70 mm (1/2 in)
B: Piping length (m) of liquid pipe with outside diameter of 9.52 mm (3/8 in)
C: Piping length (m) of liquid pipe with outside diameter of 6.35 mm (1/4 in)
Additional charging amount (g) = (A × 110) + (B × 50) + (C × 30) - 3,300
NOTE: Do not remove refrigerant, even if the additional amount calculated is negative.
Example:
Indoor unit
45,000 Btu
Indoor unit
45,000 Btu
Outdoor unit
90,000 Btu
Liquid pipe (mm)
Gas pipe (mm)
9.52
15.88
L2: 10 m
Liquid pipe (mm)
Gas pipe (mm)
9.52
15.88
L3: 7 m
Liquid pipe (mm)
Gas pipe (mm)
12.70
25.40
L1: 30 m
Liquid pipe diameter (mm) Piping length (m) Coefficient
12.70 30 A = 30
9.52 17 B = 17
6.35 0 C = 0
Applying the formula,
(30 × 110) + (17 × 50) + (0 × 30) - 3,300 = 850
The additional charging amount is 850 g.
- 192 -
2-5. Additional charge calculation 2. Pipe design